6,000lb Cedarapids Batch Plant
(#0323-#JNMC5950-ASPHALT_PLANT)
>>more photos
- Cedarapids Tower- 6,000lbs,H40C-E Hot mix plant, S/N 29797, CR screen deck, reject chute off screen, hot bins, pugmill with wem motor and gearbox, bucket elevator, one location grease station, under plant chute Barber Greene dryer - 8'x30', DC65X107, cradle chain driven, 81/2" tires, motor and gearbox, thickness burner end. .26/.28/.30. Gencor AF40 burner, runs on gas, cyclone, all ductwork Cold feed bins - 4- 8'10" bins, stationary, bin extensions on outside only, top rap around walkway, 22" gathering conveyor w/ 7.5hp motor, 20" feeders, 2nd bin has vibrator, variable speed 3hp motors,1st bin has small rust holes on top, inside bins has lifting eyes. Bins drop onto Conveyor that feeds dryer - 24",30' long, small grizzly .....Ac system: NONE........... Dustex Baghouse - 2 section, 10'6" wide, pulse jet, 9 pulsars with 6 Goyen pulsars per controller, single 5HP auger, auger dumps to 3hp, 12", 20' auger that feeds bucket elevator. 150HP fan, Control House - Block building, Gencor Systems batching controls, Genn 111 burner controls, SL300 CPU,start/stop panel, MC center in back with quick disconnects, most plant wire under ground, some books and manuals onsite
$59,500
Location: Alabama
For more information, contact Michael Trephan.
Call 239.825.9456 or
E-mail.
The equipment listed is presented in "AS-IS WHERE-IS condition with NO warranties given or implied".
It is the responsibility of the buyer to inspect the equipment as to its condition before the sale.
In the event of a sale, the Buyer is responsible for any taxes, fees, permits and transportation of
any equipment that may be purchased.
It is assumed that all equipment that is still in place will be the responsibility of the buyer to
take it down and remove it from the property within 30 days from the date of final payment unless
otherwise agreed to in writing by all parties. The buyer accepts all responsibilities for his equipment
after final payment, insurance and liabilities. The seller or former owners accept NO responsibilities
for the equipment purchased unless otherwise agreed to in writing by all parties after final payment is made.
The Buyer on removal of his equipment from the former owners site will provide the necessary insurance as per
the Rules and Regulations of the Respective Company. The Buyer agrees that he will abide by any and all
company rules and regulations while on the former owners site.
Terms: All equipment to be paid 100% in US Dollars before any work or removal from the site.